Installer Documentation Pack
Everything installers need, in one place.
This documentation hub provides quick access to all Add2Rad technical materials, ensuring consistent, high-quality installs across every property and programme.
๐ Purpose
The Installer Documentation Pack is designed to give heating engineers, DLO teams, subcontractors and retrofit installers a single source of truth for:
- technical standards
- installation methodology
- commissioning steps
- system compatibility
- warranty conditions
Clear, centralised documentation reduces errors, prevents call-backs and supports SHDF/PAS 2035 compliance.
๐ Documents Included
Technical Data Sheet
Core product specifications, temperature ratings, materials and compatibility details.
Installation Instructions
Step-by-step guide covering:
- preparation
- fitting
- bonding checks
- flow-temperature optimisation
- commissioning
Commissioning Checklist
A structured list to ensure:
- correct installation
- performance validation
- notes on tricky spaces
- future maintenance reference
Warranty Conditions
Everything required to maintain warranty compliance, including:
- installation requirements
- operating limits
- claims procedure
Risk & Method Overview
High-level RAMS-style summary to support:
- health and safety requirements
- on-site responsibilities
- contractor documentation
- pre-start and toolbox talks
๐งฐ How To Use This Pack
Before Each Job
- Review installation instructions
- Download the commissioning checklist
- Confirm the systemโs temperature and hydraulic conditions
- Note any special requirements (voids, access, vulnerable tenants)
During Installation
- Follow the installation guide step-by-step
- Use tricky spaces guidance where airflow is restricted
- Maintain clean surfaces and ensure proper adhesion
After Installation
- Complete the commissioning checklist
- Log observations for PAS 2035 risk-path documentation
- Provide resident-facing handover materials
- Record any site constraints for future reference
๐ Why This Pack Matters
- Ensures consistency across installers
- Reduces risk of incorrect fitting
- Protects warranty conditions
- Improves system performance at low temperatures
- Supports quality assurance for SHDF and PAS 2035 projects
โReliable installs come from reliable documentation. This pack ensures every installer works to the same high standard.โ
Bookmark this page and return to it before every Add2Rad installation or survey.